MINING OVERVIEW.
Geological formation is Warukin = 99% (6,000 – 6,400 ADB) Planned production per year: 2.1M with coal reserved.
10 million ton (base on Feasibility Study VDTM).Last drilling and logging geophysical exploration by KPP in 2015 in January to April 2015 on a site of +250 hectares found measureable +10.0 million tons of coal, Maximum coal thickness is 3.9 meter and minimum thickness is 0.5 meter.
PT. Victor Dua Tiga Mega handles Overburden Removal, Coal Cleaning, COal Hauling to Crusher and Jetty. In Q2 2017 PT.Victor Dua Tiga Mega installed FLoating Crane in VDTM’s Intermediate Stock Pile Located in Talio to maintain coal quality and decrease handling downtime.
in Q1 2018, PT.Victor Dua Tiga Mega started doing further explorations by drilling in unexplored potential area within the concession to increase and maximize potential reserve for long term and stable supply.