MINING OVERVIEW.

Geological formation is Warukin = 99% (6,000 – 6,400 ADB) Planned production per year: 2.1M with coal reserved.

10 million ton (base on Feasibility Study VDTM).Last drilling and logging geophysical exploration by KPP in 2015 in January to April 2015 on a site of +250 hectares found measureable +10.0 million tons of coal, Maximum coal thickness is 3.9 meter and minimum thickness is 0.5 meter.

PT. Victor Dua Tiga Mega handles Overburden Removal, Coal Cleaning, COal Hauling to Crusher and Jetty. In Q2 2017 PT.Victor Dua Tiga Mega installed FLoating Crane in VDTM’s Intermediate Stock Pile Located in Talio to maintain coal quality and decrease handling downtime.

in Q1 2018, PT.Victor Dua Tiga Mega started doing further explorations by drilling in unexplored potential area within the concession to increase and maximize potential reserve for long term and stable supply.

Some alt text

LOGISTIC MAP

Coal Movement.

Mine PIT Area Crushing Plant
2,5 Kilometer (15 Minutes)
Crushing Plant Jetty
2,5 Kilometer (15 Minutes)
Jetty ISP Talio
85 Nautical Miles (20 Hours)
ISP Talio Taboneo Anchorage
140 Nautical Miles (30 Hours)

COAL PRODUCTION

Coal Production from 2017 to 2020 with units of tons.

2017
331.878 Tons
2018
1.100.000 Tons
2019
1.500.000 Tons
2020
2.000.000 Tons

High – CV Mine With Low Ash, Low Sulphur Coal.

MINING FACILITIES

Objectively whiteboard transparent models for prospective
information. Authoritatively myocardinate.

service

CONVEYOR

Location : Jetty/Port
Max 1000 Mt/Hours
Barge SIze 230-270 Feet/Jumbo
Barge Cap 3600-5500

service

STOCK PILE

Location: Jetty/Port
Capacity 14.000Mt
Loading Time 6-8 Hours

service

CRUSHING PLANT & ROM STOCK

Location KM-2,5
Fine Stock Capacity 100.000Mt

service

WORKSHOP & MESS

Workshop 2 base maximum for PC1250 or Similar.
Mess Capacity for 200-250 employees.

service

INTERMEDIATE STOCK PILE

Stock Pile Capacity 200.000Mt
Barge Size 300feet
Loading and Unloading Jetty with Concrete Fenders (Built – 2008)
Concrete Pathway Raised by 1,5M at the Stock Pile Location
COmplete Facility for Office, Spare Part Store, Repair Workshop & Camp.
30M Long Concrete Jetty Pathway with 50M Piling Dept.
Floating Crane capacity 500MT/H

Top